From Three Stars to Five: The Power of Performance
Green building certification is not just a once-off achievement: it is an ongoing journey of measurement, management and continuous improvement.
Owned by Redefine Properties, Golf Air Park II shows what happens when sustainability moves beyond design intent and becomes part of ongoing building management. The industrial development in Cape Town’s Airport Industria was first assessed under the Green Star Existing Building Performance (EBP) tool, achieving a 3-Star rating. Rather than treating this as an end point, the rating provided a baseline of actual operational performance – a framework to understand where the building could improve and to guide the next stage of its sustainability journey. Today, Golf Air Park II has progressed to a 5-Star Green Star rating, demonstrating the value of certification as a management tool rather than a badge.

Measure to manage
EBP certification asks a different question from simply assessing what a building was designed to achieve: how is the building actually performing? Energy and water consumption, waste management, operational practices, maintenance and system performance all contribute to the outcome. Buildings are dynamic assets: performance shifts as equipment ages, tenants change and new technologies emerge. Regular measurement provides the information needed to respond.
For Redefine Properties, the initial rating highlighted performance gaps and created a framework for improvement. Over subsequent years, opportunities were translated into action, embedding sustainability into ongoing management and ultimately lifting the building’s performance to a higher level.
As the Green Star Accredited Professional on the project, I saw first-hand how certification can drive change. The value of EBP is that it tells us what is actually happening in a building. A 3-Star rating gives you a baseline. From there, the question becomes: what can we do differently to improve performance? At Golf Air Park II, that approach ultimately moved the building from 3 to 5 Green Stars. The significance lies not only in achieving a higher rating, but in the process required to get there. It demonstrates that sustainability can become an ongoing operational objective, not just something considered at design or refurbishment stage.
Existing buildings
South Africa’s vast existing building stock represents one of the industry’s greatest opportunities to reduce environmental impact while creating efficient, resilient assets. For owners, improving performance delivers benefits beyond environmental outcomes: reduced resource consumption, improved operational efficiency and better environments for occupants. EBP provides a structured way to measure progress and demonstrate it credibly.
Golf Air Park II shows what this progression looks like in practice. The initial certification was the baseline; the higher rating is the outcome. The real story is the journey in between. A rating is not a destination or permanent label – building performance is never static. The most effective sustainability strategies are those that establish a cycle of measure, manage, improve and measure again. Golf Air Park II’s journey is a powerful example of that principle, demonstrating that existing buildings can improve significantly when performance is measured, opportunities identified and sustainability embedded into everyday asset management.
For the property industry, this is the leadership opportunity: not simply to build greener, but to continually make the buildings we already have perform better. The ultimate measure of a sustainable building is not the rating it achieves once, but how much better it can become. www.misplon.co.za
About the author

Sally Misplon is the founder and Principal Green Building Consultant at Misplon Green Building Consulting, a specialist sustainability consultancy established in 2015. A GBCSA-Accredited Professional and AP+, Sally has extensive experience in Green Star Existing Building Performance (EBP) certifications across South Africa’s commercial, retail and industrial property sectors. Sally has been involved in more than 450 Green Star EBP certifications, working with leading property owners and organisations to improve the environmental performance of existing buildings. She also serves as a third-party Green Star assessor and moderator for GBCSA, bringing a strong understanding of both the technical and practical application of sustainable building performance.
Misplon Green Building Consulting
Main image: Golf Air Park II in Airport Industria, Cape Town